Support the author!
In Khabarovsk, about 40,000 residents were left without heat and hot water due to a heating main accident
Private draft
In Khabarovsk, due to an accident on a heating main, about 40,000 residents were left without heating and hot water, said the head of Khabarovsk Krai, Dmitry Demeshin. The emergency occurred in the city’s Industrialny District at 3:50 a.m. local time, and it was about minus 15 degrees outside.
According to Dmitry Demeshin, 147 facilities were initially disconnected from heat supply, including 125 residential buildings, that is, about 40,000 people. After some subscribers were switched to another heating main, 82 facilities are now still without heat and hot water, the governor said on Saturday morning. This is reported by The Moscow Times.
The accident occurred in Khabarovsk’s Industrialny District at 3:50 local time. Demeshin came to the site and said that 6 pieces of special equipment and 5 motor pumps are being used to eliminate the consequences, pumping water out of the heating pipeline.
Residents in local public groups write that the Flegontova and Stroitel districts, as well as part of the houses on Industrialnaya Street, were left without heat and hot water. One subscriber complained: “Since April and almost every month, it’s either problems with water or with electricity!”
The day before, the Far Eastern Generating Company (DGK), which is responsible for the region’s heating networks, reported the successful completion of preparations for the heating season and the receipt of documents from the Russian Ministry of Energy. The company said that in 2026, 357 units of major equipment were repaired and 32,653 km of heating networks were upgraded or replaced.
In February, there was already a major accident on TM-33 in Khabarovsk: then residents of at least 119 apartment buildings and 40 private homes were left without heating and hot water. Now the governor has not named exact deadlines for restoring heat and water supply, and the Ministry of Emergency Situations has set up warm tents on site for workers so they can pump a large volume of water out of the heating pipeline before repairs.
